Hydraulic Pipework Design
The cost involved with installing new hydraulic equipment in a plant, site running the interconnecting pipework, and commissioning the system is often comparable to the supply cost of the power unit and valve stands. And yet design of the pipework, and selection of the standards of fittings and installation is often overlooked.
CMA engineers have been managing site pipework projects for over 25 years. We have the experience and equipment necessary to cover all aspects of installing and commissioning appropriate standard pipework for any project.
- Design of pipe sizing and site route.
- Comprehensive understanding of the complexities of fittings and standards.
- Comprehensive understanding of the requirements of AS4042 for hydraulic pipework.
- Welded, flared, swaged, or cutting-ring style pipework – we know and have used all systems.
- Site management and professional project planning.
- Pipe fitters, general site tradesmen, and certified TIG welding technicians.
- Flushing and Pressure Testing using the CMA Flushing Rig – Up to 700 l/min and 600 Bar.
- Inspection, testing and documentation.